The GM&O approached Bloomington from the south via a long cut. Here the mid-afternoon Alton Limited nears Bloomington in June 1957 with EMD E-7 unit No. 102 in the lead. The engineer has dropped the train from its 90-mile-per-hour pace in preparation for the station stop only a few miles up the line.